1300 800 080

AVAILABLE 24/7
1300 800 080
GET A QUICK

Quote

How long does it take to install a split system air conditioner?

Category:

When planning to install a split system air conditioner, the most common question is, “How long does it take to install an air conditioner, The installation process usually involves setting up both indoor and outdoor units, connecting them with refrigerant lines, and managing the electrical wiring.
Installation time varies depending on the complexity of the installation, the type of air conditioning system, and whether it is a single unit or a multi-zone system with multiple indoor units.

Typically, installation takes between 4 and 8 hours, but it may take longer for complex systems like ducted air conditioning or if the outdoor unit requires a concrete base. Additionally, installation time and cost may be influenced by peak seasons or existing systems. Always seek professional advice for accurate estimates tailored to your air conditioning installation needs.
WE’RE HERE TO HANDLE ALL YOUR
24/7 Emergency Electrician

Factors Affecting Installation Time

Property type

The type of property significantly impacts the time required for installation. In residential properties, installing a split system air conditioner is generally quicker due to simpler layouts. However, older homes with existing air conditioning systems may require extra time for removal or adaptation. In contrast, newly constructed homes often allow for easier installation, reducing the overall time needed. Therefore, the property type is a key factor in determining installation duration.

Number of indoor units

The time required to install a split system air conditioner depends on the number of indoor units connected to the outdoor unit. A single unit typically takes less time to install than systems with multiple indoor units. Adding extra indoor units involves careful planning for refrigerant pipes, wiring, and mounting.
Additional indoor units often require more electrical work and precise placement, increasing the installation time. The complexity of integrating multiple units into a single system is a major factor in the installation timeline.

Electrical work required

The extent of electrical work needed for an AC system greatly affects installation time. A standard split system requires wiring between the indoor and outdoor units. If the electrical wiring needs to be updated, a new circuit is required, or a breaker needs to be installed, the process will take longer. For instance, installing a ducted air conditioning system demands more extensive electrical work to meet higher power requirements. Proper electrical work is essential for safety and directly impacts the installation timeline.

Accessibility and wall type

The ease of access to the installation site and the type of wall can influence the time required to install an air conditioning unit. Whether the indoor unit is wall-mounted or not, the wall type (e.g., drywall, brick, or concrete) determines the tools and effort needed. If the installation site is difficult to access, such as an attic or a hard-to-reach outdoor area, the installation process may take longer. Easy access to both indoor and outdoor units is crucial for efficient installation.

What are the steps to install a split system air conditioner?

Prepare the indoor unit

The first step in installing a split system air conditioner is selecting an appropriate location for the indoor unit. The chosen wall should allow proper air circulation, be strong enough to support the unit, and be near an external wall for easy connection to the outdoor unit.

Proper placement ensures efficient cooling and airflow. Wall mounting brackets are securely fixed before proceeding. This preparation is critical for the system’s efficiency, longevity, and successful installation.

Drill and run pipes and wires

Once the indoor unit’s location is determined, holes are drilled for refrigerant pipes and wiring. These connect the indoor unit to the outdoor unit. The pipes transfer refrigerant, while the wiring provides electrical power.

It is essential to install these components without leaks to ensure the system functions correctly. This step is vital for both performance and safety.

Mount the indoor unit

The indoor unit is carefully aligned and mounted using wall brackets to ensure it is level and stable. Proper mounting prevents vibration or noise, which can affect the system’s performance. Correct positioning also supports efficient airflow and allows easy access for maintenance, ensuring the system remains functional and easy to operate.

Install the outdoor unit

The outdoor unit, containing the compressor and condenser, is installed on a concrete base or metal stand outside the property. Its location is critical for optimal performance and should avoid areas with poor airflow, direct sunlight, or obstructions. The unit must be level to prevent operational issues. Professional installers ensure the outdoor unit is stable and properly connected to the system.

Connect the two units

The indoor and outdoor units are connected using refrigerant pipes and electrical wiring. These connections must be secure and meet safety standards.
After connecting the units, the system is inspected for leaks and tested to ensure all components function correctly. Proper connections are essential for the system’s efficiency and reliability.

Test the connection

Once the Air Conditioning installation is complete, the system is tested to ensure it operates as expected. This includes checking refrigerant flow, electrical connections, and the overall cooling or heating performance.

The technician inspects for leaks and verifies that the system meets performance standards. A thorough test ensures the air conditioner is ready to provide consistent comfort.

Choosing the Right Installer

Selecting the right installer is crucial for a successful air conditioning installation. Factors such as the property type, outdoor area, and existing systems influence the installation process. A qualified installer or licensed electrician conducts a site assessment to recommend the best location for the outdoor unit, taking into account the need for a concrete base, proper drainage, and adequate ventilation.

 
in installing wall brackets, evaporator coils, and complete systems. Hiring a professional ensures safety, efficiency, and long-term performance.
image 22316 1
On the
hour services
On the hour services
A Great Choice

Conclusion

A split system air conditioner is an excellent choice for improving your home’s comfort. Installation time depends on factors such as property type, number of indoor units, electrical work, and accessibility, Choosing experienced professionals ensures proper placement, safe electrical work, and long-term system performance. Whether replacing an old system or installing a new one, professional installation guarantees year-round comfort.

FAQ's

How long does it usually take to install a split system air conditioner?

Installation typically takes 4 to 8 hours, depending on complexity, the number of units, and electrical work required.
Yes, larger homes with multiple indoor units or complex layouts may take longer to install than smaller, simpler configurations.

If your electrical system is outdated or insufficient, an upgrade may be necessary. Installation costs range from $500 to $2,500, depending on the system’s complexity.

Common issues include incorrect refrigerant charging, poor electrical work, drainage problems, or improper connections between indoor and outdoor units.
Consider your home’s size, cooling needs, budget, and energy efficiency. A split system is ideal for flexible, cost-effective cooling with minimal ducting.
Yes, with the landlord’s approval. Opt for reversible installations, such as wall-mounted brackets, to minimise permanent changes.
On The Hour Services

93 Exley Road Wedderburn NSW 2560 Campbelltown & South West Sydney

Request a Quote

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *